Their own job photos
Recent projects
Every photo here is PrimeTime's own work: the trench while it is still open, the rough-in before the drywall, the shower once the tile is up, and the red portable toilets lined up on grass. Captions say what is in the picture and nothing more.
01New construction & rough-in
The work most people never see once the walls close: lines set in the framing, drains cut into a slab, a tub dropped in before the finish. A commercial restroom sits at the end of the row.




02Baths & showers
Nine bathrooms, in a row you can scroll sideways: valves in the wall, drains set to the slope of the tile, tubs set level.









03Kitchens & gas
A sink, a cooktop, a range, a gas box in the brick: the lines behind the finished surface.




04Water heaters
Tank and tankless, hung and piped. PrimeTime installs and repairs gas, electric, tankless and hybrid units.




Gas, electric, tankless and hybrid.
05Trenches & sewer lines
White pipe in red East Texas clay, photographed while the trench is still open.





Sewer work at PrimeTime covers camera inspection, hydro jetting, repair, trenchless repair and full replacement. How sewer line work goes
06Portable toilets
A fleet of red units runs alongside the plumbing, stamped with the same red and white triangle that marks every chapter on this page.



Event, job-site and RV pump-out work all run on the same number as the plumbing. Portable toilets and RV pump-out
Got a job like one of these?